TitleFILBERT STREET AND LEAVENWORTH STREET PAVEMENT RENOVATION AND SEWER REPLACEMENT (PROJECT #2731J)
Bid Date06/14/2017
Description

The Work is located along Filbert St from Baker St to Jefferson St in San Francisco, California and consists of pavement renovation, curb ramp construction, sewer replacement, AWSS work, electrical work, traffic routing, and all associated work.

Engineer's Estimate: $7,300,000

Upload Ads
Click link to view image:Filbert-St-Pavement-5-17-17.pdf
ContractorMitchell Engineering
Description

Mitchell Engineering, an Equal Opportunity Employer, is requesting sub quotes from ALL QUALIFIED AND/OR certified City & County of San Francisco LBE Subcontractors, Truckers, and Material/Equipment Suppliers for the following trades: Traffic Control; Trucking; SWPPP; Survey; Manholes; Concrete Subcontractor for Sidewalk-Curb/Gutter-Concrete Ramps; Pavement Saw Cutting; Asphalt Concrete Paving; 12" and 15" VCP; 12 inch CIPL; Catch Basins with Frame; Cast Iron Water Traps; Electrical; Street Light Poles Signals including Pedestrian Signals; TV Inspection including televise obstruction for existing sewer prior to lining work for the following Project: FILBERT STREET AND LEAVENWORTH STREET PAVEMENT RENOVATION AND SEWER REPLACEMENT (Project #2731J) located in San Francisco, CA. Mitchell Engineering requests sub quotes in the format of the bid form. Bids are due no later than June 14, 2017, at 2:30 PM.

PLEASE NOTE: Mitchell Engineering is requesting bids by Noon on bid day (Jun 14th) in order for bids to be considered.

Please respond with an email with your intent to bid this Project. All questions are welcomed. Contact Don Hart at (415) 589-7311, or by email at: dhart@mitchell-engineering.com. You may also contact Kathy Streblow at (415) 227-1040, or by email at: kstreblow@mitchell-engineering.com.