TitleSOUTHEAST WATER POLLUTION CONTROL PLANT GAS HOLDER EXCAVATION SYSTEM (CONTRACT #WW-642)
Bid Date09/07/2017
Description

The objective of the Project is to install a complete Total Solids Analyzer and its ancillary calibration system, to install a complete Dystor Evacuation System and to replace in kind two (2) boiler gas boosters, replace in kind gas monitors, and to replace the corroded structural members, roof, and to rehabilitate the two (2) gravity belt thickeners at the Southeast Water Pollution Control Plant. The Work is to be performed in San Francisco, CA.

Engineer's Estimate: $2,605,347

Upload Ads
Click link to view image:Southwest-Control-Plant-WW-642_8-24-17.pdf
ContractorMonterey Mechanical Co.
Description

Monterey Mechanical Co. is bidding this SFPUC estimated $2.6 million project as a General Contractor and is seeking sub bids and material quotes from San Francisco Small and Micro LBE's (CMD Certified) and others for the following types of work: Sheet Metal; Structural Steel; Reinforcing Steel; Electrical/Instrumentation; Painting; Concrete Pumping; Metal Buildings; Pipe & Fittings; Ready-Mix Concrete Supplier; Water & Sewage Treatment Equipment for the following project: SOUTHEAST WATER POLLUTION CONTROL PLANT GAS HOLDER EXCAVATION SYSTEM (Contract #WW-642) located at 750 Phelps St., San Francisco, CA. Bids are due no later than September 7, 2017, at 2 PM.

PLEASE NOTE: MONTEREY MECHANICAL IS REQUESTING QUOTES BY NOON ON WEDNESDAY, SEPT 6TH IN ORDER FOR BIDS TO BE CONSIDERED.

All questions should be directed to TIm Parker at (510) 632-3173. BIDS SHOULD BE FAXED TO (510) 632-0761.